We only publish what a public record supports, and we link to the record. If we can’t link to it, it isn’t here.
Statuses
- Proposed: a development application, public meeting notice or committee report.
- Strong signals: an approval, a holding-symbol removal, plans showing features like a drive-through, or construction under way.
- Confirmed: a record naming who will occupy the site: a council report, a liquor licence notice, a health inspection listing, a job posting or the business’s own announcement. When the applicant will occupy the site itself, such as a clinic or a dealership, its approval is enough. A name reported only in the news is shown with its source, but doesn’t make a site Confirmed.
- Open: the business is open, confirmed by a record or the business itself.
Public projects
Public projects, such as a hospital expansion, a recreation centre, a GO station or a water reservoir, follow their own four stages, because there’s no tenant to confirm:
- Planned: in a budget, a study, an environmental assessment or an announced plan.
- Approved: funding approved, or Council or the responsible board approves it.
- Under construction: a construction contract awarded, a groundbreaking, or work under way.
- Complete: open or in service.
We include new buildings and facilities you can see going up, and major transportation projects. We leave out routine road resurfacing and pipe replacement. They show on the map as squares.
Homes
We follow new housing from the first application until building starts: the part that happens in Council meetings and planning files, before a sales centre opens. Each project follows four stages:
- Applied: a rezoning, official plan amendment or plan of subdivision has been filed, or a public meeting held.
- Zoning approved: Council approves the rezoning or official plan amendment.
- Plans approved: the draft plan of subdivision or the site plan is approved.
- Building started: a sales centre, site alteration or servicing permit, or a groundbreaking. We stop following it here and archive the page six months later.
We track projects with 25 or more homes, and any change to the Official Plan or the urban boundary. Changes of owner or applicant, revised plans and appeals are added to the timeline when a public record shows them. We don’t list homes for sale.
Sources
- Municipality of Clarington: applications, meetings, staff reports and Council minutes.
- Local news, such as Durham Post: shown as a news report with a link.
- Businesses: store locators, job postings and announcements.
- Region of Durham open data: addresses and maps.
We check these sources every week. A person reviews every record before anything is published or any alert goes out.
What we don’t do
- Publish rumours, even likely ones.
- Name a tenant without a record that names them.
- Publish reader tips on their own.
- Copy leasing brochures or private documents.
Corrections
Spotted an error? Report it, or use “Report it” at the bottom of any site or answer. We reply within 3 business days, and fix clear mistakes sooner.
- If a record shows we got something wrong, we fix the page and add a correction to its timeline saying what changed and when. We don’t quietly rewrite what we said.
- If you own or applied for a site, we’ll correct any fact a public record supports. We won’t remove accurate information that comes from a public record.
- Error reports and tips are never published, and we don’t share who sent them.
Not affiliated with the Municipality of Clarington or the Region of Durham. Contains information licensed under the Region of Durham Open Data Licence.